
Fluids Processing Optimization
Audits of fluid processing systems to determine KPIs at the site and the following savings. Eg, install flow meters to establish water consumption before the optimization intervention.
Data Analysis for
Audits prior Spud
Data Analysis for
- Well Schematics
- Drilling Fluids Program
- OBW and WBM Reports
- Solids Control Reports
- Geology Master
- Cementation Program
- Service Companies Proposals, accepted after bid results
- Past NPTs Reported
- Offered Service Companies proposals
Audits prior Spud
- Fluid processing system audits to determine KPIs on site and following savings. Ex, installing flow meters to establish water consumption before optimization intervention.
- Evaluation on Drilling Fluids Program and its cost/efficiency convenience due to formation target
- Waste stream generated either by past rigs on the block or projected according to hydraulic program
- Permanent audits to Cementation Companies, program to apply, available equipment, cement quality and laboratory test.